Please enable JS

S. Pelletier

Publié le 12/11/2018
[addthis tool="addthis_inline_share_toolbox"]

We wish to thank you for the excellent work you did manufacturing the steel structure for the Langelier job. To date, 95% of the steel is assembled and, despite the fact that the structure was not assembled and checked before shipping all was assembled perfectly.